Close-up of a dark metal tile roof
Stock photograph · illustrative overlay · not a SureClaims project · no measurements shown

Resources / 08 guides

Documentation guides for roofing contractors and their office teams

Working guides for the people who build insurance files: the reps on the roof, the production manager, and whoever writes the estimate. They cover what a file needs, how each roof line item is supported and what to ask a supplement company, with code references labelled by edition and a reminder to check what's adopted locally.

01 / Guides

Start with the file, then work line by line

These guides deal with documenting the scope of work you perform. They aren't coverage or legal advice. Coverage questions go to the carrier, a licensed public adjuster or an attorney.

  1. Vol. 01Guide7 min read

    What to include when you send a supplement or estimate file

    The photos to take and in what order, the measurement report, the carrier's current estimate, your trades and product lines, code and permit notes, and your inspection notes, set out as checklists your crew can run before a job leaves the field.

    • Checklist
    • Photos
    • Measurements
    • Notes
  2. Vol. 02Guide9 min read

    Roof scope line items to check on a first estimate

    Drip edge, starter, ice and water barrier, ridge cap, step and counter flashing, pipe jacks, steep and high charges, waste, and detach-and-reset items. For each: why it can be missed and what supports it (a photo, a measurement, a code section where adopted, or a manufacturer instruction).

    • Line items
    • LF / SQ / EA
    • IRC 2021
  3. Vol. 03Guide10 min read

    Is drip edge required by code? What IRC R905.2.8.5 says and how to document it

    What 2021 IRC R905.2.8.5 requires at eaves and rakes, why the adopted edition and local amendments matter, when manufacturer instructions call for drip edge, and how to document it on a supplement.

    • Drip edge
    • IRC 2021
    • Eaves + rakes
  4. Vol. 04Guide9 min read

    Ice and water shield requirements: eaves, valleys and low slope

    What the 2021 IRC ice barrier section requires and where it applies, how a jurisdiction designates ice-damage areas, what the code and one manufacturer say about valleys and low-slope sections, and how to measure and document ice barrier on a supplement.

    • IRC R905.1.2
    • Valleys and low slope
    • Measuring
  5. Vol. 05Guide10 min read

    Roofing waste factor: where the figure comes from and how to support it

    What the waste line covers, why roof shape changes it, where the figure comes from (a measurement report's waste table or a measured sketch), how it's applied without double counting starter and ridge, and what to send when a reviewer questions it.

    • Waste
    • Measurement reports
    • Hips and valleys
  6. Vol. 06Guide9 min read

    Steep and high-roof charges: documenting pitch, height and access

    What steep and high-roof charges are, how to establish pitch on every facet, why the charge goes on the steep squares only, and how to show stories, eave height and access for both tear-off and installation.

    • Pitch
    • Stories
    • Access
  7. Vol. 07Guide11 min read

    What estimate reviewers check in a roof measurement report

    What a roof measurement report gives the estimate, how EagleView, Hover and Roofr each describe their reports, and the checks to run before the numbers go into a file: address, structures, pitch by facet, edges, flashing and waste.

    • Measurements
    • EagleView / Hover / Roofr
    • Checklist
  8. Vol. 08Guide10 min read

    How to choose a supplement company: 12 questions to ask before you send a file

    Twelve questions to ask any supplement company before you send it a file, from how the fee is calculated to what happens when you stop, with what a clear answer covers for each.

    • 12 questions
    • Fees and roles
    • CRM and data

Next step

Rather hand the file to a team that works this way?

We work inside your CRM, on the trades you perform. On the intro call we'll ask what you install, which CRM your jobs live in, and where files stall.

Files are shared through your CRM once you're onboarded.